Toyota Yaris: Radiator support (ASSY)
REPLACEMENT
REMOVAL
INSTALLATION
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimension diagram) Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
After welding, apply polyurethane foam to the corresponding parts.
After welding, apply body sealer and undercoating to the corresponding parts.
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.
Front fender mounting bracket (ASSY)
REPLACEMENT REMOVAL INSTALLATION Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimension diagram) Inspe ...See also:
Vehicle load limits
Vehicle load limits include total load capacity, seating capacity, towing capacity
and cargo capacity. Follow the load limits shown below. Total load capacity and
seating capacity are also describ ...
Rear floor sidemember (ASSY): Sedan
REPLACEMENT
With the rear floor pan removed.
REMOVAL
INSTALLATION
Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See ...
Cowl top side panel (ASSY): Sedan
REPLACEMENT
REMOVAL
INSTALLATION
Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimension diagram) Inspe ...